Tensar Corporation

2500 Northwinds Parkway, Suite 500

Alpharetta, GA 30009

Prism® Foundation Improvement System

Features
  • Optimal for construction of bridge approach fills, causeways, levees and dikes
  • Eliminate the need for undercutting and backfilling
  • Minimize the embankment footprint, differential settlement and fill requirements
  • Improve structural integrity with lower project costs
Description
A composite structure that distributes loads over a wider area to create a stable embankment.
  • Made in USA
  • Get quotes from distributors near you.
    Prism® Foundation Improvement System Documents (4)
    Tensar Corporation Documents (4)
    [Installation Videos]
    Your Document Package
    open